Editable WBS Numbers
Thomas Schiratti
I have a WBS from outside the program and need the Gantt's WBS numbers to be editable to reflect them. The project already had a WBS before we started using this program, and it's not feasible to change everything because the program won't let me edit it. It seems like a basic feature is missing.
T
Tim Macchi
Thanks for explaining the need to match an existing WBS. TeamGantt includes a WBS column in Gantt 2.0, and CSV import also supports WBS-based project structure: https://support.teamgantt.com/article/163-displaying-and-hiding-columns/ and https://support.teamgantt.com/article/20-importing-a-csv/
We’re still tracking the request to manually edit WBS numbers so they can align with an external project numbering system.